Pertamina Hot tap

Installation of 3 x manifolds, 9 x hot taps & structures, 7 x spools, 3 x in line valves & structures and project managers of 2 Diving Support Vessels completed on schedule for a EPCIC project.

COPI Enhanced Mercury Removal Project
Banang  Riser Changeout

Installation of 3 x manifolds, 9 x hot taps & structures, 7 x spools, 3 x in line valves & structures and project managers of 2 Diving Support Vessels completed on schedule for a EPCIC project.

Change out of 3 x 250m long 6” Manuli flexibles between the FSO and the MOPU EP5 in 50-70m water depth in the Banang Field, Offshore Kuala Terengganu, Terengganu

MOPU Riser Replacement
ABU FSO Riser Changeout
Salvage Support

Replacement of 6” export riser section. Cendor MOPU. 70m water depth. Mobilise replacement riser section. Mobilise DSV with installation spread. Removal of damaged section and installation of new section.

Repair and replacement of riser system and MWA on Abu FSO. 50m water depth.

Temp riser 6” Manuli

New riser 6” & 8” Wellstream

MWA arch weight 60 Te, buoyancy 100 T

Provision of Project & Engineering for survey & HFO removal from sunken wreck Thorco Cloud in shipping lane between Batam & Singapore.

vessel charter.png
Provision of DP2 Subsea Vessel

80 days of Debris Removal and ROV Inspection and maintenance work in South East Asia.

SPM.jpeg
One stop Marine Contractor 

Provision of full suite of marine assets including barges, tugs, AHT and DP vessel for the changeout of hoses of SPM.

satdive.jpg
Saturation Diving for HUC support

Provision of 90 days of Saturation diving services for HUC support. 

airdive.png

for more project listing, drop us a line

Air Diving for pipelay supoort work

Provision of 45 days of Air diving services to support pipe lay support at 45 m water depth.