PAST PROJECTS
Pertamina Hot tap
Installation of 3 x manifolds, 9 x hot taps & structures, 7 x spools, 3 x in line valves & structures and project managers of 2 Diving Support Vessels completed on schedule for a EPCIC project.
COPI Enhanced Mercury Removal Project
Banang Riser Changeout
Installation of 3 x manifolds, 9 x hot taps & structures, 7 x spools, 3 x in line valves & structures and project managers of 2 Diving Support Vessels completed on schedule for a EPCIC project.
Change out of 3 x 250m long 6” Manuli flexibles between the FSO and the MOPU EP5 in 50-70m water depth in the Banang Field, Offshore Kuala Terengganu, Terengganu
MOPU Riser Replacement
ABU FSO Riser Changeout
Salvage Support
Replacement of 6” export riser section. Cendor MOPU. 70m water depth. Mobilise replacement riser section. Mobilise DSV with installation spread. Removal of damaged section and installation of new section.
Repair and replacement of riser system and MWA on Abu FSO. 50m water depth.
Temp riser 6” Manuli
New riser 6” & 8” Wellstream
MWA arch weight 60 Te, buoyancy 100 T
Provision of Project & Engineering for survey & HFO removal from sunken wreck Thorco Cloud in shipping lane between Batam & Singapore.
Provision of DP2 Subsea Vessel
80 days of Debris Removal and ROV Inspection and maintenance work in South East Asia.
One stop Marine Contractor
Provision of full suite of marine assets including barges, tugs, AHT and DP vessel for the changeout of hoses of SPM.
Saturation Diving for HUC support
Provision of 90 days of Saturation diving services for HUC support.
for more project listing, drop us a line
Air Diving for pipelay supoort work
Provision of 45 days of Air diving services to support pipe lay support at 45 m water depth.